Spacegraph

Anticipating the long-term future of neighbourhoods in line with the New European Bauhaus

Kommende
Årlig
Bevilling
Tier C
HORIZON-NEB-2027-01-BUSINESS-03

Researches how local stakeholders can anticipate and plan the long-term future of existing neighbourhoods beyond the usual 5–10-year horizon.

Rumlig og byplanlægning
Byfornyelse
Klimatilpasning

Beskrivelse

Expected outcome

Project results are expected to contribute to all of the following expected outcomes: Local stakeholders adopt long-term stewardship and participate in anticipating and envisioning the long-term future of their existing neighbourhoods . Existing neighbourhoods are more resilient and can adapt to changing socioeconomic, cultural, demographic, and climatic conditions, challenges and needs.

Scope

The New European Bauhaus (NEB) is redefining the way neighbourhoods across Europe and beyond are presently planned, designed, developed, and revitalised by fostering a new paradigm for sustainable , inclusive , and beautiful living environments and lifestyles. Neighbourhoods are currently planned for short and medium term, typically with a 5 to 10-year perspective , often influenced by insufficient coordination with broader regional and national levels or changing political directions in local governance, for instance. However, fundamental changes in socioeconomic, cultural, demographic, and/or climatic conditions can challenge the long-term future resilience and adaptability of neighbourhoods. Concurrently, there is a need to include local stakeholders in anticipating and envisioning the long-term future of their existing neighbourhoods by anticipating their changing needs, circumstances, and preferences. Participatory foresight approaches can help address these challenges. Proposals are expected to address all of the following: Develop and validate a participatory foresight approach to inform the long-term planning, (re)design and development of existing neighbourhoods. The approach must cover at least the following: Analysis of socioeconomic, cultural, demographic and climate conditions, long-term trends (e.g. population decline; shift in population composition and diversity; migration between urban, peri-urban, and rural areas; societal and aesthetic acceptance in neighbourhoods), as well as the drivers for those long-term changes in the targeted neighbourhoods. Development of scenarios and visions for potential futures for the neighbourhood, including objectives, measurable targets and packages of measures. This should include intergenerational fairness perspectives that will have a major influence on neighbourhoods in the future. Use of co-creation approaches to foster the participation of diverse local stakeholders (including marginalised or underrepresented groups as well as those in a vulnerable situation). Develop and validate the participatory foresight approach in at least three neighbourhoods in different Member States and/or Associated Countries. Provide recommendations to inform local authorities, decision makers, and the public on applying the participatory foresight approach. Proposals are expected to follow a participatory and transdisciplinary approach through the integration of different actors and disciplines. This topic requires the effective contribution of social sciences and humanities (SSH) disciplines and the involvement of SSH experts, institutions, as well as the inclusion of relevant SSH expertise, in order to produce meaningful and significant effects enhancing the societal impact of the related research activities. In order to achieve the expected outcomes, international cooperation is encouraged.

What this means for cities and regions

City planning departments and neighbourhood stakeholders building long-term stewardship. Topic budget €7 million; 2 grants expected; around €3.5 million per project. Opens 5 May 2027; closes 1 December 2027. Long-range climate projections and land-use change data from Copernicus feed the scenarios this topic asks for.

Nøglefakta

Indsendelsesfrist

1. december 2027

1 December 2027, 17:00 (Brussels time)

Offentliggjort

12. december 2025

Åbner

5. maj 2027

Program

New European Bauhaus Facility

Samlet bevilling

7.000.000 €

Pr. projekt

3.500.000 €

Forventede bevillinger

2

Medfinansieringsrate

100%

Berettigelse

Berettigede lande

AT
BE
BG
HR
CY
CZ
DK
EE
FI
FR
DE
EL
HU
IE
IT
LV
LT
LU
MT
NL
PL
PT
RO
SK
SI
ES
SE
IS
LI
NO
AL
ME
MK
RS
BA
TR
UA
MD
GE
AM
IL

Berettigede NUTS-regioner

—

Berettigede organisationstyper

Kommune
Interkommunal myndighed
Region (NUTS2)
Provins (NUTS3)
Offentligt forsyningsselskab
Offentlig transportoperatør
Regional udviklingsagentur
National myndighed

Min. konsortiestørrelse

—

Min. partnerlande

—

Noter om berettigelse

Type of action for this topic

HORIZON Research and Innovation Actions (HORIZON Lump Sum Grant).

Who can apply

  • Any legal entity (public body, private body, NGO, university, research organisation, SME, large company) established in an EU Member State (including Overseas Countries and Territories), or in a Horizon Europe Associated Country.
  • The list of Horizon Europe Associated Countries is maintained on the EU Funding & Tenders Portal.

Consortium rule for this topic

Proposals must be submitted by a consortium of at least 3 independent legal entities, each established in a different EU Member State or Horizon Europe Associated Country, of which at least one must be established in an EU Member State.

Co-financing rate

  • Research and Innovation Actions (RIA): 100% of eligible direct costs + 25% flat-rate indirect costs.
  • Innovation Actions (IA): 70% of eligible direct costs (100% for non-profit legal entities) + 25% flat-rate indirect costs.
  • Coordination and Support Actions (CSA): 100%.

The applicable Type of Action is indicated on the topic record in the Funding & Tenders Portal.

Restrictions and special cases

  • Natural persons not eligible except sole traders.
  • International organisations and the JRC are eligible.
  • Other EU bodies cannot participate.
  • Financial support to third parties is allowed where the topic explicitly provides for it.

EU restrictive measures (TEU Article 29 / TFEU Article 215) and EU conditionality measures (Regulation 2020/2092) apply. Currently this excludes Hungarian public-interest trusts established under Hungarian Act IX of 2021 (Council Implementing Decision (EU) 2022/2506).

Klassifikation

Tematiske områder

Rumlig og byplanlægning
Byfornyelse
Klimatilpasning

Aktivitetstyper

plan_development
governance

Rumrelevans

Niveau C — rumværktøjer kunne plausibelt understøtte opslaget, men er ikke nævnt.

Rumtjenester

C3S
CLMS

Kilder

EU Funding & Tenders Portal

HORIZON-NEB-2027-01-BUSINESS-03

Indlæst 20. september 2026

Søskendeemner under dette opslag

Researches collective community investment and ownership models for local commercial, housing and mixed-use assets.

1. dec. 2027
Byfornyelse
Innovation

Demonstrates co-governance approaches that give residents a real role in the green transition of their neighbourhoods.

1. dec. 2027
Byfornyelse
Innovation

Demonstrates methods and solutions for intergenerational neighbourhoods as an alternative to age-segregated housing.

1. dec. 2027
Byfornyelse
Rumlig og byplanlægning

Researches ways to cut the harm construction and renovation sites cause to ecosystems, workers and neighbours, and to integrate sites better into their surroundings.

1. dec. 2027
Byfornyelse
Miljø

Demonstrates solutions that reduce the noise, pollution and severance of active railway lines and motorways and revitalise the neighbourhoods around them.

1. dec. 2027
Byfornyelse
Rumlig og byplanlægning
Miljø

Relaterede muligheder

Develops innovative solutions for the sustainable and beautiful use of urban vertical space (green walls, vertical farms, multi-use facades).

1. dec. 2026
Byfornyelse
Rumlig og byplanlægning
Biodiversitet

Develops sustainable, inclusive and beautiful solutions for thermal comfort in residential and public buildings.

1. dec. 2026
Byfornyelse
Klimaforebyggelse / energi

Advances sustainable maintenance and repair measures for existing building stock.

1. dec. 2026
Byfornyelse
Klimaforebyggelse / energi