Spacegraph

Revitalising neighbourhoods around existing railway and motorway corridors

Komi
Árlegt
Styrkur
Tier C
HORIZON-NEB-2027-01-REGEN-03

Demonstrates solutions that reduce the noise, pollution and severance of active railway lines and motorways and revitalise the neighbourhoods around them.

Endurnýjun borgarsvæða
Rýmis- og borgarskipulag
Umhverfi

Lýsing

Expected outcome

Project results are expected to contribute to all of the following expected outcomes: The use of the innovative solutions reduces the environmental, ecological, economic, social and health negative effects of existing, active railway lines and motorways on demonstrator sites, contributing to their revitalisation. Improved adoption of solutions by the stakeholders such as local authorities, inhabitants, architects, engineers, landscape architects or urban planners.

Scope

Active railway lines and motorways are an integral part of the European landscape. However, they can be perceived as sources of disturbances such as pollutants, noise and air pollution, invasive alien plants species vectors, potential hazards, etc. Moreover, railways lines and motorway may negatively impact surrounding neighbourhoods through which they pass, making them unsightly, neglected, unattractive as well as biodiversity harmful. Innovative solutions are thus required to reduce the environmental, ecological, economic, social and health negative effects that active railway lines and motorways can have on surrounding neighbourhoods and to revitalise these places and turn them into more liveable, inclusive, safe, attractive and biodiverse ones in line with the sustainability , inclusion and aesthetic values of the New European Bauhaus. Proposals are expected to address all of the following: Develop and demonstrate a package of measures to mitigate the negative effects of active railway lines and motorways on nearby neighbourhoods and revitalise those neighbourhoods. Implement this package of measures in three distinct neighbourhoods – one urban, one peri-urban, and one rural – located in different Member States and/or Associated Countries. Measure and assess the changes in environmental, ecological, economic, social and health impacts resulting from the package of measures developed and applied in the demonstrator sites. Identify barriers hindering the implementation of the proposed measures, including regulatory aspects and propose solutions to overcome them. Ensure the scalability and replicability of the measures through guidance and documented best practices for municipalities and relevant stakeholders. Proposals are expected to follow a participatory and transdisciplinary approach through the integration of different actors and disciplines and to co-create the solution(s), engaging with relevant stakeholders such as public authorities, architects, urban and landscape planners or inhabitants. Proposals are expected, to the extent possible, to contribute to the urban greening goal set in the Nature Restoration Regulation. This topic requires the effective contribution of social sciences and humanities (SSH) disciplines and the involvement of SSH experts, institutions as well as the inclusion of relevant SSH expertise, in order to produce meaningful and significant effects enhancing the societal impact of the related research activities. Proposals are expected to allocate at least 0.8% of their budget for engaging with the Horizon Europe-funded 'New European Bauhaus hub for results and impact' to share their intermediate and final results, findings and learning, as well as to contribute to impact assessment. Synergies should also be explored and, as appropriate, pursued with other relevant initiatives, such as the Europe’s Rail Joint Undertaking (EU-Rail) .

What this means for cities and regions

Local authorities with neighbourhoods cut through by rail or motorway corridors, together with planners, landscape architects and infrastructure owners. Topic budget €11 million; 2 grants expected; around €5.5 million per project. Opens 5 May 2027; closes 1 December 2027. Land-cover and vegetation data help design green buffers and document biodiversity and heat effects along the corridor.

Lykilatriði

Skilafrestur

1. desember 2027

1 December 2027, 17:00 (Brussels time)

Birt

12. desember 2025

Opnar

5. maí 2027

Áætlun

New European Bauhaus Facility

Heildarpakki

11.000.000 EUR

Á verkefni

5.500.000 EUR

Búist við styrkjum

2

Hlutfall samfjármögnunar

70%

Hæfi

Hæf lönd

AT
BE
BG
HR
CY
CZ
DK
EE
FI
FR
DE
EL
HU
IE
IT
LV
LT
LU
MT
NL
PL
PT
RO
SK
SI
ES
SE
IS
LI
NO
AL
ME
MK
RS
BA
TR
UA
MD
GE
AM
IL

Hæf NUTS svæði

—

Hæfar stofnanategundir

Sveitarfélag
Millisveitarfélagasamtök
Svæði (NUTS2)
Hérað (NUTS3)
Almannatæki
Almenningssamgönguaðili
Svæðisþróunarskrifstofa
Ríkisvald

Lágmarksstærð samsteypu

—

Lágmarksfjöldi samstarfslanda

—

Athugasemdir um hæfi

Type of action for this topic

HORIZON Innovation Actions (HORIZON Action Grant Budget-Based).

Who can apply

  • Any legal entity (public body, private body, NGO, university, research organisation, SME, large company) established in an EU Member State (including Overseas Countries and Territories), or in a Horizon Europe Associated Country.
  • The list of Horizon Europe Associated Countries is maintained on the EU Funding & Tenders Portal.

Consortium rule for this topic

Proposals must be submitted by a consortium of at least 3 independent legal entities, each established in a different EU Member State or Horizon Europe Associated Country, of which at least one must be established in an EU Member State.

Co-financing rate

  • Research and Innovation Actions (RIA): 100% of eligible direct costs + 25% flat-rate indirect costs.
  • Innovation Actions (IA): 70% of eligible direct costs (100% for non-profit legal entities) + 25% flat-rate indirect costs.
  • Coordination and Support Actions (CSA): 100%.

The applicable Type of Action is indicated on the topic record in the Funding & Tenders Portal.

Restrictions and special cases

  • Natural persons not eligible except sole traders.
  • International organisations and the JRC are eligible.
  • Other EU bodies cannot participate.
  • Financial support to third parties is allowed where the topic explicitly provides for it.

EU restrictive measures (TEU Article 29 / TFEU Article 215) and EU conditionality measures (Regulation 2020/2092) apply. Currently this excludes Hungarian public-interest trusts established under Hungarian Act IX of 2021 (Council Implementing Decision (EU) 2022/2506).

Flokkun

Þemadomain

Endurnýjun borgarsvæða
Rýmis- og borgarskipulag
Umhverfi

Tegundir athafna

demonstration
plan_development

Geimviðeigandi

Stig C — geimtól gætu hugsanlega stutt kallinn en eru ekki nefnd.

Geimþjónustur

Copernicus Sentinel
CLMS

Heimildir

EU Funding & Tenders Portal

HORIZON-NEB-2027-01-REGEN-03

Tekið inn 20. september 2026

Systurþemu undir þessum kalli

Researches collective community investment and ownership models for local commercial, housing and mixed-use assets.

1. des. 2027
Endurnýjun borgarsvæða
Nýsköpun

Researches how local stakeholders can anticipate and plan the long-term future of existing neighbourhoods beyond the usual 5–10-year horizon.

1. des. 2027
Rýmis- og borgarskipulag
Endurnýjun borgarsvæða
Aðlögun að loftslagi

Demonstrates co-governance approaches that give residents a real role in the green transition of their neighbourhoods.

1. des. 2027
Endurnýjun borgarsvæða
Nýsköpun

Demonstrates methods and solutions for intergenerational neighbourhoods as an alternative to age-segregated housing.

1. des. 2027
Endurnýjun borgarsvæða
Rýmis- og borgarskipulag

Researches ways to cut the harm construction and renovation sites cause to ecosystems, workers and neighbours, and to integrate sites better into their surroundings.

1. des. 2027
Endurnýjun borgarsvæða
Umhverfi

Tengd tækifæri

Develops innovative solutions for the sustainable and beautiful use of urban vertical space (green walls, vertical farms, multi-use facades).

1. des. 2026
Endurnýjun borgarsvæða
Rýmis- og borgarskipulag
Líffræðilegur fjölbreytileiki

Develops sustainable, inclusive and beautiful solutions for thermal comfort in residential and public buildings.

1. des. 2026
Endurnýjun borgarsvæða
Loftslagsmótun / orka

Advances sustainable maintenance and repair measures for existing building stock.

1. des. 2026
Endurnýjun borgarsvæða
Loftslagsmótun / orka